ARCHIVED EVENTS

image110

two 12 feet long flight stations, with enough space between them to fit even the biggest plane :-)

image111

My son Sebastian Helping to build flight stations

image112

Shawn, Mitch and Ken, hard at work spreading the sand. Runway is now much smoother :-)

Field Preview / BBQ 11/19/2017

image121

After five hours of serving over 80 sandwiches and hotdogs, Shawn and Sebastian chilling out.

image122

Richard and Crystal Barr, Chris Marazzo

image123

My son Sebastian proudly serving BBQ sandwiches, chips and cookies, he really enjoyed it, too.

image124

Irrigation

3 zone irrigation working flawlessly 

image125

Birds eye VIEW

image126

Nearly done, everyone is tired, time to go home.

image127

Joe obviously having fun ;-)

image128

Captain Gregg Morgan, thank you !

image129

Kevin hard at work, bright and early

Bermuda Sod Day

image130

20 plus guys, helping install huge amount of Bermuda Sod in only six and half hours, thank you all for coming.

image131

Two of these trucks 8AM on 11/04/2017

Prep

image132

Dell working hard prepping, thank you !

image133

Tree Removal

40 acres will be cleared of trees, starting in about 2 weeks, tree line will approximately be 1000' to your left, 700 feet to your right and 650 straight ahead.


image134

One more picture of our beautiful runway.

image135

More pictures of the runway

NORTH GEORGIA MODEL AVIATORS

image136

  • 40 ACRES OF OPEN SPACE
  • 500 FEET TO THE TREE LINE
  • 600 FOOT GRASS RUNWAY, CUT SHORT TO ALLOW SMALL PLANES TO TAKE OFF AND LAND EASILY
  • 175 FEET OF COVERED AREA, INCLUDING CLUBHOUSE
  • THIS FIELD WILL FEATURE A CLUB HOUSE WITH A LARGE PORCH AREA, WITH CEILING FANS, A/C AND HEAT.  (COMING SOON)
  • 7 BAYS ON EACH SIDE OF THE CLUB HOUSE
  • LIGHTS, POWER OUTLETS (COMING SOON) AND PORTA POTTY
  • INTERNET AND LIVE FEED CAMERAS SYSTEM

WIDENING AND LENGTHENING OF THE RUNWAY COMING SOON!

image137

Runway

Nearly done, irrigation will be installed next week.

image138

Another view from NE, additional 50 feet is being added to the runway.


image139

Clearing of all trees in the 40 acre, is in progress and should be competed in the next 2 to 3 months.

image140

Installing Irrigation Rotors

She might not fly RC planes, but knows how to work hard. Thank you !!!

image141

Ditch Witch

5 iches per minute, 600' in 4 hours, painfully SLOW, but FUN !!!

image142

Chris & Shawn

Two Awesome friends helping with 1000' of irrigation plumbing, weather is perfect 65 degrees.

image143

Done

2 days of hard work.

image144

Valve Box

Three zones, 6 rotors per zone, wifi controler for easy operation.

image145

Almost done

Can't thank these 2 guys enough.

image146

The crew

image147

Runwy grooming

Richard Barr, super nice guy, brought his tractor and accessories all the way from Canton.

Spent all day prepping the runway and surroundings for this weenkends Bermuda Sod installation. Thank you.

image148

Pump house

Kenneth hard at work and early in the morning, too

unloading

Work is about to start, on our new Pilot's stations. Richard Barr unloading his heavy equipment.

image149

Luckily thanks to two of our neighbors, one letting us use his roller and the other his 4x4 , this job was a breeze and fun.

image150

We were going to push the roller by hand, LOL

image151

Richard hard at work building Pilot's stations

image152

Again, HUGE thanks to Richard Barr, for bringing heavy equipment to help us.

image153

Framing a 5 foot wide concrete walkway down to the runway, which also allows wheelchair access.

Pilot's stations build

image154

View from the runway

image155

View from the pits